The Nyah Floodplain Restoration Project is one in a series of ‘supply measures’ — offset projects intended to provide the same environmental outcomes as water recovery to the Murray-Darling Basin. The implementation of these projects is likely to damage the ecological character of Ramsar sites and threaten nationally significant species.
You can download our submission to the Department of Agriculture, Water and the Environment by downloading it here or scrolling through the document below.