Reports | 19th Nov, 2026

Submission: Rehabilitation Environment Effects Statement (EES)

Our Submission

This is Environment Victoria’s submission to the Victorian planning department on the Environment Effects Statement (EES) for the rehabilitation of the Hazelwood coal mine in the Latrobe Valley. The EES examines ENGIE’s proposal to fill the mine with water and connect the resulting lake to the Latrobe River.

Our submission raises concerns about how much water the lake would need, what a river connection could mean for water quality, and who would be responsible for the site in the long term. We’re calling for clear, measurable standards for mine closure and for Traditional Owners and the local community to help shape the future of Hazelwood.

DOWNLOAD THE SUBMISSION HERE

Introduction 

The Hazelwood coal mine is a massive site, comparable in size to the entire town of Morwell which is directly adjacent. As the first of three major coal mines in the Latrobe Valley region to close, and in close proximity to residential areas, waterways and aquifers, it is imperative that an appropriately high, precedent-setting standard is set for the closure.

Mine closure is a well-understood field with established guidelines and practices. For example, the International Council on Mining and Metals (ICMM) publishes the Integrated Mine Closure: Good 

Practice Guide, which emphasises the importance of having a vision for post-closure, linked to realistic post-closure land uses.

Unfortunately, the EES fails at this first step. It is not written with any post-closure land use in mind beyond “a range of productive land uses […] determined at a later time.”

Without identifying realistic post-closure land uses – a process that needs to be undertaken with the community and Traditional Owners – there is no basis on which to identify sensitive receptors, undertake risk assessments, and articulate clear closure criteria. Post-closure land use planning is not a brainstorming exercise; it is an iterative and evidence-based process to demonstrate that the identified end points are achievable. Rehabilitation must demonstrate no significant risk or show through a transparent basis of evidence, acceptable to stakeholders, that opportunity will exceed risks. Anything less is just marketing.

Environment Victoria is anxious for an appropriate and leading-practice rehabilitation plan to be approved for the Hazelwood mine. The rehabilitation of the Hazelwood coal mine is a pivotal point in the future of water for the Latrobe Valley and Gippsland, an area that is already under significant water stress. A decade has already passed since the cessation of power generation at Hazelwood, with limited and opaque progress on rehabilitation despite repeated advice from experts and significant community interest. The EES process needs to deliver to a high standard.

People in Gippsland care deeply about water and climate. Several groups have already articulated their visions for the land and waters after coal.

Read our full submission below.